Tradeoff Triangle

tradeoff triangle, project triangle, project management triangle, fast cheap good, time cost quality, quality triangle

Image of the “Tradeoff Triangle,” which is composed of 3 parts: Fast, Cheap, and Good.
Instructions: Pick just 2 of the 3.
Fast + Cheap = Low Quality
Fast + Good = Expensive
Cheap + Good = Slow
All 3 (Fast, Cheap, Good) = Scope Change

Light lilac background with lilac triangle and three circles (blue at top, pink on bottom right, light tangerine on bottom left).

Find more at https;//laconteconsulting.com

Leave a Reply